I had wanted to test both the track and electrical interfaces on the new module with the Hot Springs Junction module. When I was setting this up I realized that I had never installed the trolley poles on the small interface module and the scenery seemed a bit lite or faded compared the the main module.
So after a bit of work here is the view after adding a bit of greener scenery to the small interface module along with the trolley poles.
The track and electrical interfaces worked fine with repeated testing so this new module is ready for exhibit.
Last I had 1/4 inch Acrylic shields made for this module and attached to
each side with 8-32 thumb screws. These won't been needed in every
layout setup but I wanted them for this next show as we won't have any
rope barriers.
No comments:
Post a Comment