Finally we get to the second and final post on the curved railroad bridge. I needed to get the highway done first before installing the bridge.
The bridge assembly was air brushed with Testors pale green and then
weathered with Testors acrylic weathering wash and Bragdon Enterprises weathering powders.
The highway sign was made from a photo I found on the Internet. The printout was glued to a .020 thick piece of styrene which was then glued to the bridge.
The support columns were paint Testors concrete and given the same weathering treatments before being glued into place in the highways center divider.
With the bridge installed, the module is now ready for track and ballast.
No comments:
Post a Comment