Thursday, May 30, 2019

First update on the new module

Several things have been accomplished over the last week or so in the rebuilding of this module. The modification to the module that I started to give it a channel for a highway underpass is now complete.
The underside has been re-sealed with some left over paint and the aluminum brackets for the electrical connections pointed out here with the blue arrows are done.
I finished a new set of legs for this module.  This is a copy of the set I built for the first module last year and is covered in some detail in THIS POST.

These legs are adjustable to the 2 heights we set the layout up at.  Both sets are shown here with each being at a different height.

No comments:

Post a Comment